BRIEF INTRODUCTION OF THE PROJECT
In the middle of a green area a new kindergarten was built in 2014 to replace the old prefabricated school. The main energy related target was the attainment of the passive house standard, since the building was used as a study project for the Flemish government.
The building contains 4...
Read more
Best practice of school renovation #17 Vibeengen Primary School
BRIEF INTRODUCTION OF THE PROJECT
The school is a new school completed in 2014 for 500 pupils. The main energy related targets were to achieve the best Danish low-energy class. Partially prefabricated facades are used. The building employs both central and decentral mechanical ventilation in combination with natural ventilation for passive cooling. The energy...
Read more
The school is a new school completed in 2014 for 500 pupils. The main energy related targets were to achieve the best Danish low-energy class. Partially prefabricated facades are used. The building employs both central and decentral mechanical ventilation in combination with natural ventilation for passive cooling. The energy...
Best practice of school renovation #1 – Romsdal Secondary School
BRIEF INTRODUCTION OF THE PROJECT
Møre and Romsdal county Counsil adopted the school’s building program in December 2012. The main energy related targets are to achieve passive house standard and energy label A, to use solid wood as the main material, to use “low-tech” ventilation systems (hybrid solution), to reduce the green house gas...
Read more
Møre and Romsdal county Counsil adopted the school’s building program in December 2012. The main energy related targets are to achieve passive house standard and energy label A, to use solid wood as the main material, to use “low-tech” ventilation systems (hybrid solution), to reduce the green house gas...
Best practice of school renovation #18 Capriva del Friuli Kindergarten
BRIEF INTRODUCTION OF THE PROJECT
Capriva del Friuli is a new kindergarten that was completed in 2013. The main energy related targets were to achieve plus house standard, to use prefabricated timber facades, a ventilation unit with > 90 % heat recovery and to achieve a final energy demand of 24 kWh/m2 GTAa.
Read more
Read more