Category Archives: Best practices database

Best practice of school renovation #16 Siemianowice Kindergarten

BRIEF INTRODUCTION OF THE PROJECT
The kindergarten was built in 2013/2014. The main targets were design and construction of an energy efficient kindergarten building in a short period of time (all works limited to 5 months). Prefabricated timber technology was chosen to reach this target. For a high level of indoor comfort, balanced mechanical...
Read more

Best practice of school renovation #10 Neumarkt Secondary School

BRIEF INTRODUCTION OF THE PROJECT
The school was built in in 1978 and was renovated in 2011. The main energy related targets were the attainment of a nearly zero energy building (nZEB) and partially passive house standard after the renovation by using prefabricated timber façade elements for the renovation of the existing exterior wall,...
Read more

Best practice of school renovation #9 Rainbach Secondary School

BRIEF INTRODUCTION OF THE PROJECT
The school was built in 1972 and renovated in 2013. The main energy targets were the attainment of a zero-/plusenergy building after the renovation, the use of prefabricated timber facade elements and an energy supply based on renewable energy sources. Furthermore an improvement of the indoor air quality should...
Read more