BRIEF INTRODUCTION OF THE PROJECT
The school was built in 1972 and renovated in 2013. The main energy targets were the attainment of a zero-/plusenergy building after the renovation, the use of prefabricated timber facade elements and an energy supply based on renewable energy sources. Furthermore an improvement of the indoor air quality should be achieved.
GENERAL INFORMATION
Location: Rainbach, Austria
Project type: Renovation
Net cost: 1.050 €/m² (gross floor area)
Main contractor: Verein zur Förderung der Infrastruktur der Marktgemeinde Rainbach im Mühlkreis & CoKG
Architect: Domenig-Meisinger, ARCH + MORE ZT and Albert P. Böhm, archevolution
Building owner: Verein zur Förderung der Infrastruktur der Marktgemeinde Rainbach im Mühlkreis&CoKG
Gross floor area: 3 243 m2
Number of storeys: 5 building parts: 1st and 2nd part 3 floors, 3rd part 1 floor, 4th and 5th part gyms
Construction time: 2013