BRIEF INTRODUCTION OF THE PROJECT
The school was built in in 1978 and was renovated in 2011. The main energy related targets were the attainment of a nearly zero energy building (nZEB) and partially passive house standard after the renovation by using prefabricated timber façade elements for the renovation of the existing exterior wall, by removing the thermal bridges of the building as far as possible, by installing a centralized mechanical ventilation system with heat recovery and by using renewable energy sources for heating and domestic hot water preparation.
For this renovation the school has won the ZT.Award in 2009 (appreciation award for “energy optimized retrofit”).
GENERAL INFORMATION
Location: Neumarkt/Steiermark, Austria
Project type: Renovation
Net cost: 950-1450 EURO/m2
Main contractor: Baustein Bau- und Projektmanagement teamgmi Ingenieurbüro ARCH+MORE ZT
Architect: Gerhard Kopeinig, ARCH + MORE ZT
Building owner: Neumarkt Municipality
Gross floor area: 3 526 m2
Number of stories: 4 building parts: 1st part 3 floors, 2nd and 3rd part 2 floors, 4th part gym
The retrofit’s finish: 2011