BRIEF INTRODUCTION OF THE PROJECT
The school was built in in 1972/73 and was renovated in 2007. The main targets of the renovation were the attainment of the passive house standard after the renovation, the renovation with a “holistic” approach, the use of ecological building materials and renewable energy sources as well as the improvement of the user comfort and the indoor air quality. The building envelope was highly insulated, including also new developed prefabricated timber facade elements, and a mechanical ventilation system was installed. The daylight use was optimized and an external solar shading system was installed.
GENERAL INFORMATION
Location: Schwanenstadt, Austria
Project type: Renovation
Net cost: 954 €/m² (gross floor area)
Main contractor: NEUE HEIMAT Oberösterreich Gemeinnützige Wohnungs- und SiedlungsgesmbH
Architect: Heinz Plöderl, Pauat Architekten
Building owner: Municipality of Schwanenstadt
Gross floor area: 6 835 m2
Number of storeys: 4 building parts: 1st and 2nd part 3 floors, 3rd part 2 floors, 4th part gym
Construction time: 2007