Best practice of school renovation #14 Kekec Kindergarten

Best practice of school renovation #14 Kekec Kindergarten

BRIEF INTRODUCTION OF THE PROJECT
Kekec kindergarten is an extension of a typical Slovene prefab kindergarten from the 1980s. The extension was built in 2010, with a construction time of only 2 months. The main energy related targets were to achiecve low energy standard, to use prefabricated timber facades and the use of quality insulation, good materials, big windows on the exterior and glassed surfaces for the toilet areas so that the ligths would be used as seldom as possible.

GENERAL INFORMATION
Location: Ljubljana, Slovenia
Project type: New building, extension
Net cost: 170.000 EURO
Structural engineer dr. Bruno Dujič, CBD d.o.o.
Architect: Arhitektura Jure Kotnik
Main contractor: Riko Hiše d.o.o.
Building owner: Municipality of Ljubljana
Gross floor area: 123 m2
Number of storeys: 1
Construction time: 2010

FRONTRUNNER FOLDER HERE

Comments are closed.